Attached is a notification about geological investigations at Talbingo Reservoir and continuing work to install the underwater communication cable. The work will involve intermittent disruptions to the boat ramp at Talbingo Reservoir from 1 August to 31 October 2020.
Snowy 2.0 Work Notification – Geological investigations + ongoing underwater installation of communication cable at Talbingo – from 1 August 2020
Leave a reply